0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Engaging consultants in green projects: exploring the practice in Malaysia

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Smart and Sustainable Built Environment, , n. 1, v. 8
Page(s): 80-94
DOI: 10.1108/sasbe-06-2018-0033
Abstrait:

Purpose

The purpose of this paper is to explore the practice of engaging key project consultants for the development of green projects in Malaysia.

Design/methodology/approach

A qualitative approach is adopted in this research using the face-to-face semi-structured interview process with 18 respondents consisting of developers and architects of green projects that have obtained green certification by the Malaysian Green Building Index.

Findings

The engagement of consultants is divided into three stages: engagement method; consultant selection method; and evaluation process. The engagement method can be initiated by the client or through the architect. The direct selection is the preferred strategy in engaging architects, while open strategy is commonly adopted for engaging other key consultants. The evaluation process consists of request for proposal evaluation and negotiation before appointment is awarded. In addition, there are four main criteria in selecting the consultants: client’s preference, fee flexibility, green project requirement and consultant firm’s internal strengths.

Research limitations/implications

The study is based on the Malaysian context and based on the engagement of main consultants in green development projects and, thus, cannot be generalised to other consultants’ engagement in conventional projects.

Practical implications

This research presents the process that can contribute to better planning, controlling and management of the consultants’ engagement process. The selection criteria shall form a reference in selecting the most suitable consultants for the project.

Originality/value

This study attempts to understand how consultants are engaged in green projects, an important management stage in project initiation, but has received little attention in the past.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/sasbe-06-2018-0033.
  • Informations
    sur cette fiche
  • Reference-ID
    10779905
  • Publié(e) le:
    12.05.2024
  • Modifié(e) le:
    12.05.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine