Energy Losses or Savings Due to Air Infiltration and Envelope Sealing Costs in the Passivhaus Standard: A Review on the Mediterranean Coast

Auteur(s): ORCID
ORCID
ORCID
Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 7, v. 14
Page(s): 2158
DOI: 10.3390/buildings14072158
Abstrait:

To obtain the Passivhaus Certificate or Passivhaus Standard (PHS), requirements regarding building envelope air tightness must be met: according to the n50 parameter, at a pressure of 50 Pa, air leakage must be below 0.6 air changes per hour (ACH). This condition is verified by following the blower door test protocol and is regulated by the ISO 9972 standard, or UNE-EN-13829. Some construction techniques make it easier to comply with these regulations, and in most cases, construction joints and material joints must be sealed in a complex way, both on façades and roofs and at ground contact points. Performing rigorous quality control of these processes during the construction phase allows achieving a value below 0.6 ACH and obtaining the PHS certification. Yet, the value can increase substantially with the passage of time: as windows and doors are used, opened, or closed; as envelope materials expand; with humidity; etc. This could result in significant energy consumption increases and losing the PHS when selling the house at a later point in time. It is therefore important to carefully supervise the quality of the construction and its execution. In this study, we focused on a house located in Sitges (Barcelona). The envelope air tightness quality was measured during four construction phases, together with the sealing of the joints and service ducts. The blower door test was performed in each phase, and the n50 value obtained decreased each time. The execution costs of each phase were also determined, as were the investment amortisation rates based on the consequent annual energy demand reductions. Air infiltration dropped by 43.81%, with the final n50 value resulting in 0.59 ACH. However, the execution costs—EUR 3827—were high compared to the energy savings made, and the investment amortisation period rose to a 15- to 30-year range. To conclude, these airtightness improvements are necessary in cold continental climates but are not applicable on the Spanish Mediterranean coast.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10795318
  • Publié(e) le:
    01.09.2024
  • Modifié(e) le:
    01.09.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine