Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays
Auteur(s): |
Panagiotis Ch. Anastasopoulos
Samuel Labi Abhishek Bhargava Fred L. Mannering |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mars 2012, n. 3, v. 138 |
Page(s): | 390-398 |
DOI: | 10.1061/(asce)co.1943-7862.0000437 |
- Informations
sur cette fiche - Reference-ID
10166231 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018