0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Elevated Link Road in Rio de Janeiro, Brazil

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Structural Engineering International, , n. 1, v. 9
Page(s): 13-14
DOI: 10.2749/101686699780482195
Abstrait:

An elevated roadway, 1.4 km long and covering 8500 m², was opened to traffic in March 1998 after a construction period of 18 months. The roadway links three existing elevated roadways (the Red Line, the Perimetral Line and the Rio-Niteroi Bridge access) in Rio de Janeiro. Belly-shaped post-tensioned precast concrete beams and partially precast slabs were used to construct the roadway. A new device for joining the new roadway with the existing ones was applied successfully.

Ouvrages et projets

Lieux géographiques

  • Informations
    sur cette fiche
  • Reference-ID
    10000865
  • Publié(e) le:
    17.08.2001
  • Modifié(e) le:
    13.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine