Effects of Change Orders on the Cost and Schedule of Rural Road Maintenance Projects
Auteur(s): |
Pramen P. Shrestha
Kabindra K. Shrestha (Project Engineer, Gunda Corporation, Houston, TX 77036; formerly, Graduate Assistant, Dept. of Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.) Thomas K. Kandie (Network Administrator, Kenya Rural Road Authority, Blue Shield Towers, Hospital Rd., Upper Hills, P.O. Box 48151-00100, Nairobi, Kenya.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2017, n. 3, v. 9 |
Page(s): | 04517010 |
DOI: | 10.1061/(asce)la.1943-4170.0000227 |