Effects of Change Orders on Cost Growth, Schedule Growth, and Construction Intensity of Large Highway Projects
Auteur(s): |
Pramen P. Shrestha
Ruiko Maharjan (Graduate Student, Civil and Environmental Engineering and Construction, Howard R. Hughes College of Engineering, Univ. of Nevada, Las Vegas, NV 89154.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2018, n. 3, v. 10 |
Page(s): | 04518012 |
DOI: | 10.1061/(asce)la.1943-4170.0000264 |
- Informations
sur cette fiche - Reference-ID
10579890 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021