The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance
Auteur(s): |
Hong Min Zhang
Heap-Yih Chong Yu Zeng Wei Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, août 2022, n. 6, v. 30 |
Page(s): | 2503-2522 |
DOI: | 10.1108/ecam-04-2020-0225 |
- Informations
sur cette fiche - Reference-ID
10665170 - Publié(e) le:
09.05.2022 - Modifié(e) le:
02.09.2023