An Early Cost Estimation Model for Hydroelectric Power Plant Projects Using Neural Networks and Multiple Regression Analysis
Auteur(s): |
Murat Gunduz
Haci Bayram Sahin |
---|---|
Médium: | article de revue |
Langue(s): | letton |
Publié dans: | Journal of Civil Engineering and Management, mars 2015, n. 4, v. 21 |
Page(s): | 470-477 |
DOI: | 10.3846/13923730.2014.890657 |
- Informations
sur cette fiche - Reference-ID
10354508 - Publié(e) le:
13.08.2019 - Modifié(e) le:
13.08.2019