0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Dynamic safety prewarning mechanism of human–machine–environment using computer vision

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 8, v. 27
Page(s): 1813-1833
DOI: 10.1108/ecam-12-2019-0732
Abstrait:

Purpose

This study provides a safety prewarning mechanism, which includes a comprehensive risk assessment model and a safety prewarning system. The comprehensive risk assessment model is capable of assessing nine safety indicators, which can be categorised into workers’ behaviour, environment and machine-related safety indicators, and the model is embedded in the safety prewarning system. The safety prewarning system can automatically extract safety information from surveillance cameras based on computer vision, assess risks based on the embedded comprehensive risk assessment model, categorise risks into five levels and provide timely suggestions.

Design/methodology/approach

Firstly, the comprehensive risk assessment model is constructed by adopting grey multihierarchical analysis method. The method combines the Analytic Hierarchy Process (AHP) and the grey clustering evaluation in the grey theory. Expert knowledge, obtained through the questionnaire approach, contributes to set weights of risk indicators and evaluate risks. Secondly, a safety prewarning system is developed, including data acquisition layer, data processing layer and prewarning layer. Computer vision is applied in the system to automatically extract real-time safety information from the surveillance cameras. The safety information is then processed through the comprehensive risk assessment model and categorized into five risk levels. A case study is presented to verify the proposed mechanism.

Findings

Through a case study, the result shows that the proposed mechanism is capable of analyzing integrated human-machine-environment risk, timely categorising risks into five risk levels and providing potential suggestions.

Originality/value

The comprehensive risk assessment model is capable of assessing nine risk indicators, identifying three types of entities, workers, environment and machine on the construction site, presenting the integrated risk based on nine indicators. The proposed mechanism, which adopts expert knowledge through Building Information Modeling (BIM) safety simulation and extracts safety information based on computer vision, can perform a dynamic real-time risk analysis, categorize risks into five risk levels and provide potential suggestions to corresponding risk owners. The proposed mechanism can allow the project manager to take timely actions.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-12-2019-0732.
  • Informations
    sur cette fiche
  • Reference-ID
    10577008
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine