Dynamic Response and Safety Control of Newly Poured Secondary Lining Concrete under Large Section Tunnel Blasting-A Case Study of Longnan Tunnel of Ganshen High-speed Railway
Auteur(s): |
Linghao Xiong
Chuanbo Zhou Nan Jiang Teng Wang Xianzhong Meng |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Periodica Polytechnica Civil Engineering |
DOI: | 10.3311/ppci.20206 |
- Informations
sur cette fiche - Reference-ID
10693348 - Publié(e) le:
23.09.2022 - Modifié(e) le:
23.09.2022