0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Budownictwo i Architektura, , n. 2, v. 14
Page(s): 005-010
DOI: 10.35784/bud-arch.1638
Abstrait:

Ready mixed concrete (RMC) is the primary material required for buildings and public infrastructure work. RMC is produced to meet customer’s demands and its deliveries must conform to construction site and technological operating constraints – the material cannot be prepared in advance and stored. Concrete production scheduling and truck dispatching is mainly handled manually by experienced RMC batching plants staff. The paper presents simulation model which can be used to asses alternative strategies for truck allocation and production planning in stochastic environment. The models’ operation is illustrated by a notional case – the model prompted solutions of improved transhipment efficiency and reduced plant operating cost under assumed operating constraints.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.35784/bud-arch.1638.
  • Informations
    sur cette fiche
  • Reference-ID
    10475834
  • Publié(e) le:
    25.11.2020
  • Modifié(e) le:
    25.11.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine