Digital Twin Hospital Buildings: An Exemplary Case Study through Continuous Lifecycle Integration
Auteur(s): |
Yang Peng
Ming Zhang Fangqiang Yu Jinglin Xu Shang Gao |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Advances in Civil Engineering, janvier 2020, v. 2020 |
Page(s): | 1-13 |
DOI: | 10.1155/2020/8846667 |
Abstrait: |
Hospital buildings usually contain sophisticated facility systems and special medical equipment, strict security requirements, and business systems. Traditional methods such as BIM are becoming less capable of real-time updates of building status and big data volume. By proposing innovations both in technique and management—a “continuous lifecycle integration” method based on the concept of Digital Twin (DT) and “early movement” of the general contractor, this paper reported a successful project case in a large hospital in China. The case realized continuous, scheduled integration of static data and dynamic data of more than 20 management systems from the design, construction, pre-O&M phase up to the O&M phase. Then, a DT software system with real-time visual management and artificial intelligent diagnosis modules was developed and deployed in a newly built DT control center. Managers have the ability to grasp the detailed status of the whole hospital by visual management and receive timely facility diagnosis and operation suggestions that are automatically sent back from the digital building to reality. The case has been steadily running for more than a year in the hospital and achieved desired performance by reducing energy consumption, avoiding facility faults, reducing the number of requested repairs, and enhancing the quality of daily maintenance work. |
Copyright: | © Yang Peng et al. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
4.92 MB
- Informations
sur cette fiche - Reference-ID
10506811 - Publié(e) le:
27.11.2020 - Modifié(e) le:
02.06.2021