건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템 (Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site)
Auteur(s): |
Daewon Kim
Tae-Yong Kim Yoonseok Shin Gwang-Hee Kim |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of the Korea Institute of Building Construction (한국건축시공학회지), avril 2016, n. 2, v. 16 |
Page(s): | 133-140 |
DOI: | 10.5345/jkibc.2016.16.2.133 |
- Informations
sur cette fiche - Reference-ID
10761533 - Publié(e) le:
15.03.2024 - Modifié(e) le:
15.03.2024