Different Delay Analysis Techniques Applied to the American Institute of Architects A201-2007 Standard Form of Contract
Auteur(s): |
Islam H. El-adaway
(Richard A. Rula Endowed Professor of Construction Engineering and Management, Assistant Professor of Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., 235C Walker Hall, P.O. Box 9546, MS 39762 (corresponding author).)
Salwa A. Fawzy (Contracts Manager, Dar Al Mimar Group, 1 Abu Bakr El Seddik St., Dokki, Giza, Egypt.) Robert Bingham (Undergraduate Student, Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., 235 Walker Engineering Building, P.O. Box 9546, MS 39762.) Patrick Clark (Undergraduate Student, Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., 235 Walker Engineering Building, P.O. Box 9546, MS 39762.) Taylor Tidwell (Undergraduate Student, Civil and Environmental Engineering, Mississippi State University, 501 Hardy Rd., 235 Walker Engineering Building, P.O. Box 9546, MS 39762.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2014, n. 3, v. 6 |
Page(s): | 02514001 |
DOI: | 10.1061/(asce)la.1943-4170.0000145 |
- Informations
sur cette fiche - Reference-ID
10579763 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021