0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Diagnosis of 100 years old concrete from M. Lutoslawski Bridge in Lublin

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Budownictwo i Architektura, , n. 2, v. 13
Page(s): 109-118
DOI: 10.35784/bud-arch.1885
Abstrait:

The paper presents the results investigation of old concrete. The material  was retrieved from M. Lutoslawski Bridge which is located in Zamojska Street. M. Lutoslawski built two bridges in Lublin  by using Francois Hennebique projects. The carried out investigations include recognition in situ and during laboratory tests. Among others, the concrete compression strength and  the diagnosis of concrete microstructure were made by means of SEM and EDS techniques. The conclusions pertain to both macro and microscopic analyses. The concrete strength results were compared with other authors' results obtained for similar old concretes.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.35784/bud-arch.1885.
  • Informations
    sur cette fiche
  • Reference-ID
    10475981
  • Publié(e) le:
    25.11.2020
  • Modifié(e) le:
    25.11.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine