Development of entry location, entry timing and entry mode decision model for construction firms in international markets
Auteur(s): |
Christopher Nigel Preece
Che Maznah Mat Isa Hamidah Mohd Saman Che Khairil Che Ibrahim |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, octobre 2015, n. 4-5, v. 34 |
Page(s): | 236-257 |
DOI: | 10.1080/01446193.2015.1084429 |
- Informations
sur cette fiche - Reference-ID
10206720 - Publié(e) le:
05.12.2018 - Modifié(e) le:
05.12.2018