Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects
Auteur(s): |
Krushna Chandra Sethi
V. Rathinakumar S. Harishankar Gautam Bhadoriya Aditya Kumar Pati |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering, 24 juin 2024, n. 6, v. 25 |
Page(s): | 4633-4644 |
DOI: | 10.1007/s42107-024-01069-x |
- Informations
sur cette fiche - Reference-ID
10784946 - Publié(e) le:
20.06.2024 - Modifié(e) le:
20.09.2024