Development of Construction Safety Dashboard Based on Four-Dimensional Building Information Modeling for Fall Prevention: Case Study of Stadium Roof Works

Auteur(s):
ORCID
ORCID

ORCID
Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 9, v. 14
Page(s): 2882
DOI: 10.3390/buildings14092882
Abstrait:

The construction sector is known for exposing workers to numerous potential hazards, with falls from heights being the leading cause. These fatal fall accidents not only result in human loss but also impose significant financial costs on construction projects. However, current safety planning and management is typically carried out manually using safety documents and 2D models, which are time-consuming and labor-intensive. There is also a lack of visualization for the placement of temporary safety facilities (TSFs) during construction. Meanwhile, Building Information Modeling (BIM) has the potential to be used as a comprehensive workspace planning for TSFs in a scheduling manner. Therefore, this study proposes the development of a construction safety dashboard to inform workers about fall hazards using spatial–temporal data stored in 4D BIM. The proposed approach includes four modules: (1) identification and assessment of risk from identified work activities, (2) development of 4D BIM model, (3) creation of a dashboard to share safety knowledge, and (4) validation of the dashboard through interviews with safety managers and site workers. This approach is tested on a stadium project, particularly focusing on roof work activities, where workers are most prone to fall hazards. The proposed method aims to provide ease for site workers to access safety knowledge, including risk identification (including risk, fatality, location, and time), visualization of TSFs, personal protective equipment, and safety work instructions. This interactive dashboard also enables safety managers to plan safety measures, allocate TSFs efficiently, and make well-informed decisions to effectively mitigate risks.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10799939
  • Publié(e) le:
    23.09.2024
  • Modifié(e) le:
    23.09.2024
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine