0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes

Auteur(s): (Offsite Construction Research Center (OCRC), Dept. of Civil Engineering, University of New Brunswick, Fredericton, NB, Canada)
(Offsite Construction Research Center (OCRC), Dept. of Civil Engineering, University of New Brunswick, Fredericton, NB, Canada)
(Department of Architecture and Built Environment, Northumbria University, Newcastle-upon-Tyne, UK)
(Offsite Construction Research Center (OCRC), Dept. of Civil Engineering, University of New Brunswick, Fredericton, NB, Canada)
(School of Engineering, University of British Columbia, Kelowna, BC, Canada)
Médium: article de revue
Langue(s): anglais
Publié dans: Construction Management and Economics
Page(s): 1-20
DOI: 10.1080/01446193.2024.2431280
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1080/01446193.2024.2431280.
  • Informations
    sur cette fiche
  • Reference-ID
    10808809
  • Publié(e) le:
    17.01.2025
  • Modifié(e) le:
    17.01.2025
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine