Developing an Optimum Material Procurement Schedule by Integrating Construction Program and Budget Using NSGA-II
Auteur(s): |
Santu Kar
Chirag Kothari Kumar Neeraj Jha |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, avril 2021, n. 4, v. 147 |
Page(s): | 04021017 |
DOI: | 10.1061/(asce)co.1943-7862.0002028 |
- Informations
sur cette fiche - Reference-ID
10561003 - Publié(e) le:
10.02.2021 - Modifié(e) le:
19.02.2021