0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Developing a Risk Management Process for General Contractors in the Bidding Stage for Design–Build Projects in Vietnam

Auteur(s):




Médium: article de revue
Langue(s): anglais
Publié dans: Buildings, , n. 11, v. 11
Page(s): 542
DOI: 10.3390/buildings11110542
Abstrait:

Design–build (DB) projects have become increasingly popular for construction projects in developing countries due to the cost and scheduling advantages and their design optimization ability. As a result, much research has been conducted on improving DB efficiency in terms of cost, scheduling, risk management, etc. However, the existing studies have mainly focused on the owner’s roles, whereas general contractors (GCs) must also take many risks on behalf of owners in DB projects. The adequate identification and assessment of risks before engaging a contractor can increase the likelihood of a project’s success, at least from a DB contractor’s perspective. Therefore, this study interviewed procurement experts to conduct a survey at the local level, then analyzed, developed, and proposed an additional risk management process (RMP) for use by GCs during the bidding process of DB projects. A case study was conducted with a large Vietnamese GC to evaluate the effectiveness of the process and find ways to optimize it in the future. The results of the study showed that risk management during a DB project is imperative. Nevertheless, preparing bids is time-consuming and increases the contingency costs, reducing the competitiveness of the bid prices for contractors. Therefore, depending on the specific project and risk management objectives, an RMP is recommended for adjusting the risk management target to reduce the risk, while still maintaining the competitiveness of the bid prices.

Copyright: © 2021 by the authors; licensee MDPI, Basel, Switzerland.
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

Lieux géographiques

  • Informations
    sur cette fiche
  • Reference-ID
    10639376
  • Publié(e) le:
    30.11.2021
  • Modifié(e) le:
    02.12.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine