Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory
Auteur(s): |
S. Mahdi Hosseinian
A. Arjomand C. Q. Li G. Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, avril 2022, n. 4, v. 148 |
DOI: | 10.1061/(asce)co.1943-7862.0002252 |
- Informations
sur cette fiche - Reference-ID
10656498 - Publié(e) le:
17.02.2022 - Modifié(e) le:
17.02.2022