Developing a Fuzzy Value-for-Money Analysis Model for Annuity-Based Public-Private Partnership Infrastructure Projects under Consideration of Risk Mitigation Capability
Auteur(s): |
Andreas Wibowo
Matthias Sundermeier |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, juillet 2020, n. 7, v. 146 |
Page(s): | 04020081 |
DOI: | 10.1061/(asce)co.1943-7862.0001872 |
- Informations
sur cette fiche - Reference-ID
10421825 - Publié(e) le:
12.05.2020 - Modifié(e) le:
12.05.2020