Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors
Auteur(s): |
Amir Bahador Ketabi
Gholamreza Heravi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, mai 2021, n. 2, v. 29 |
Page(s): | 643-668 |
DOI: | 10.1108/ecam-07-2020-0536 |
- Informations
sur cette fiche - Reference-ID
10603350 - Publié(e) le:
17.04.2021 - Modifié(e) le:
23.03.2022