Determination of residual weld stresses with the incremental hole-drilling method in tubular steel bridge joints
Auteur(s): |
Evy Van Puymbroeck
Wim Nagy Heng Fang Hans De Backer |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Procedia Engineering, 2018, v. 213 |
Page(s): | 651-661 |
DOI: | 10.1016/j.proeng.2018.02.061 |
- Informations
sur cette fiche - Reference-ID
10669189 - Publié(e) le:
28.05.2022 - Modifié(e) le:
28.05.2022