Determination a Reasonable Concession Period for (PPP) Projects

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Civil Engineering Journal, , n. 6, v. 5
Page(s): 1235-1248
DOI: 10.28991/cej-2019-03091328
Abstrait:

Public Private Partnership (PPP) are agreements where public bodies enter into long term contractual with private entities for construction or management the public sector facilities, or provision services to the community. Internal rate of return (IRR), pay back regime or tariff, and the concession period (CP) are essential items to success (PPP) projects. This research presents a systematic approach for a win-win partnership contract determined on a quantitative basis, by informing the partnership parties how long contract period should be made.  Essence of the proposed methodology is that project completion time should allow a competent contractor to complete the project on schedule and operation period should be long enough to enable the concessionaire to achieve a reasonable return, but not too long such that concessionaire’s return is excessive and public sector’s interests are sacrificed. A case study of a PPP project in Mayoralty of Baghdad was conducted to evaluate performance of the developed mathematical models. The determined concession period (CP) has found to be approximately equal to actual concession period (CP) granted to the private sector.  Evaluation shows the possibility to adopt the proposed approach to determine the concession period (CP) more effectively. Instead of opportunism policy, the proposed methodology enables local government of Baghdad province to enhance its policies of awarding the partnership projects to increase private sector participation in infrastructure development. Finally, the proposed method can be used by investment practitioners as a decision support tool for contract concession period (CP), and is worth popularizing to design the contracted concession period (CCP) for partnership projects in Iraq, and also can use as a methodology to assess the critical aspects which related to partnership projects in general.

Copyright: © 2019 Ali Hasan Hadi, Kadhim Raheim Erzaij
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10340728
  • Publié(e) le:
    14.08.2019
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine