0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Civil Engineering Magazine, , n. 4, v. 58
Page(s): 54-55
Abstrait:

In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask contractors to bid. On the bridge currently being constructed over the Susquehanna River at Lewisburg, PaDOT used a single design-construct contract. This cut the cost by at least $150,000 and time of design by six months. Previously lon large bridges the state had designed each structure in steel and concrete, then permitted bidding contractors to submit alternates. The contractor’s alternate design was always the more cost-effective design and as a result was the one used. Thus, by going to a design-construct contract, and skipping preparation of the pre-contract designs, PennDOT was simply avoiding doing work that was not needed. Next, the agency plans to use the approach on the Allenwood Bridge, also over the Susquehanna River.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10015656
  • Publié(e) le:
    25.07.2004
  • Modifié(e) le:
    14.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine