사장교 가이드 파이프 앵커 형식에서의 정착강관 설계절차 (Design Process of Fixing Pipe in Guide Pipe-Anchor System for Cable-Stayed Bridge)
Auteur(s): |
Sung Nam Hong
Sun Kyu Park Byung Gun Park |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of the Korea Institute for Structural Maintenance and Inspection (한국구조물진단유지관리공학회 논문집), juillet 2011, n. 4, v. 15 |
Page(s): | 212-220 |
DOI: | 10.11112/jksmi.2011.15.4.212 |
- Informations
sur cette fiche - Reference-ID
10779479 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024