Design of Tunnels in London Clay Using Sprayed Concrete as Primary Support. Report of the Meeting On 25 January 1995.
Auteur(s): |
C. Clayton
S. Nattrass R. Evans A. Muir Wood A. M. Wood |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, juillet 1995, n. 3, v. 113 |
Page(s): | 183-184 |
DOI: | 10.1680/igeng.1995.27814 |
- Informations
sur cette fiche - Reference-ID
10555633 - Publié(e) le:
24.01.2021 - Modifié(e) le:
04.03.2021