0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Design and Parameter Optimization of a Full-Scale Wastewater Reclamation Plant Including Pretreatment, Electrodialysis Reversal, and Ion Exchange in Steel Manufacturing Processes

Auteur(s): (Scientist, Dept. of New Materials Research and Development, China Steel Corporation, No. 1 Chung Kung Rd., Kaohsiung 81233, Taiwan.)
(Engineer, Dept. of New Materials Research and Development, China Steel Corporation, No. 1 Chung Kung Rd., Kaohsiung 81233, Taiwan.)
(Engineer, Dept. of New Materials Research and Development, China Steel Corporation, No. 1 Chung Kung Rd., Kaohsiung 81233, Taiwan.)
(Assistant Professor, Dept. of Safety, Health and Environmental Engineering, Ming Chi Univ. of Technology, No. 84 Gungjuan Rd., Taishan, New Taipei City 24301, Taiwan (corresponding author).)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Environmental Engineering (ASCE), , n. 10, v. 142
Page(s): 05016003
DOI: 10.1061/(asce)ee.1943-7870.0001118
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)ee.1943-7870.0001118.
  • Informations
    sur cette fiche
  • Reference-ID
    10585839
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine