Design and development of a KBES for planning and scheduling ready-mixed concrete supply
Auteur(s): |
Yow Thim Lam
Jahidul Alum Richard H. Neale |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, mars 1994, n. 2, v. 12 |
Page(s): | 165-170 |
DOI: | 10.1080/01446199400000022 |
- Informations
sur cette fiche - Reference-ID
10212594 - Publié(e) le:
04.12.2018 - Modifié(e) le:
04.12.2018