Design and construction of Loughor railway viaduct with semi-integral abutments
Auteur(s): |
Thomas Ashworth
Chris Young |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Bridge Engineering, septembre 2018, n. 3, v. 171 |
Page(s): | 191-200 |
DOI: | 10.1680/jbren.17.00012 |
- Informations
sur cette fiche - Reference-ID
10086275 - Publié(e) le:
01.12.2018 - Modifié(e) le:
01.12.2018