Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK

  1. Magdy Mohamed (2019), "Delay Analysis Methodologies Used by Engineering and Construction Firms in Egypt" in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 3, American Society of Civil Engineers (ASCE), p. 04519006

    https://doi.org/10.1061/(ASCE)LA.1943-4170.0000293

  2. Soomro (2019), "Causes of Time Overrun in Construction of Building Projects in Pakistan" in Eng. Technol. Appl. Sci. Res., v. 9 (2019), p. 3762
  3. Abdelmaguid Tamer F. (2019), "Halting decisions for gas pipeline construction projects using AHP: a case study" in Operational Research, v. 19, n. 1, Springer Science and Business Media LLC, p. 179-199

    https://doi.org/10.1007/s12351-016-0277-2

  4. Chan Albert P.C. (2001), "Time–cost relationship of public sector projects in Malaysia" in International Journal of Project Management, v. 19, n. 4, Elsevier BV, p. 223-229

    https://doi.org/10.1016/S0263-7863(99)00072-1

  5. Assaf Sadi A. (2006), "Causes of delay in large construction projects" in International Journal of Project Management, v. 24, n. 4, Elsevier BV, p. 349-357

    https://doi.org/10.1016/j.ijproman.2005.11.010

  6. Aibinu A.A (2002), "The effects of construction delays on project delivery in Nigerian construction industry" in International Journal of Project Management, v. 20, n. 8, Elsevier BV, p. 593-599

    https://doi.org/10.1016/S0263-7863(02)00028-5

  7. Vaardini (2016), "Study on cost overruns in construction projects: A review" in Int. J. Appl. Eng. Res., v. 11 (2016), p. 356
  8. Gasik (2015), "An analysis of knowledge management in PMBOK® guide" in PM World J., v. 4 (2015), p. 1
  9. van Dorp J.R. (1999), "Statistical dependence in risk analysis for project networks using Monte Carlo methods" in International Journal of Production Economics, v. 58, n. 1, Elsevier BV, p. 17-29

    https://doi.org/10.1016/S0925-5273(98)00081-4

  10. Irizarry, Javier / Karan, Ebrahim P. / Jalaei, Farzad (2013): Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Dans: Automation in Construction, v. 31 (mai 2013).

    https://doi.org/10.1016/j.autcon.2012.12.005

  11. Naamane (2015), "A Brief Introduction to Building Information Modelling (BIM) and its interoperability with TRNSYS" in Renew. Energy Sustain. Dev., v. 1 (2015), p. 126
  12. Maguire (1991), "An overview and definition of GIS" in Geogr. Inf. Syst. Princ. Appl., v. 1 (1991), p. 9
  13. Shirowzhan Sara (2019), "Spatial Analysis Using Temporal Point Clouds in Advanced GIS: Methods for Ground Elevation Extraction in Slant Areas and Building Classifications" in ISPRS International Journal of Geo-Information, v. 8, n. 3, MDPI AG, p. 120

    https://doi.org/10.3390/ijgi8030120

  14. Dziadosz Agnieszka (2015), "Risk Analysis in Construction Project - Chosen Methods" in Procedia Engineering, v. 122, Elsevier BV, p. 258-265

    https://doi.org/10.1016/j.proeng.2015.10.034

  15. Ghassemi (2011), "Transitioning to Integrated Project Delivery: Potential barriers and lessons learned" in Lean Constr. J., v. 2011 (2011), p. 32
  16. Bordoli, David W. / Baldwin, Andrew N. (1998): A methodology for assessing construction project delays. Dans: Construction Management and Economics, v. 16, n. 3 (mai 1998).

    https://doi.org/10.1080/014461998372358

  17. "Climbing the Curve: 2015 Global Construction Project Owner’s Survey"
  18. Industry Trend Analysis-PPP Failures Highlight Project Execution Risks http://www.infrastructure-insight.com/industry-trend-analysis-ppp-failures-highlight-project-execution-risks-feb-2017
  19. Sambasivan Murali (2007), "Causes and effects of delays in Malaysian construction industry" in International Journal of Project Management, v. 25, n. 5, Elsevier BV, p. 517-526

    https://doi.org/10.1016/j.ijproman.2006.11.007

  20. Ruqaishi, Mohammed / Bashir, Hamdi A. (2015): Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 3 (mai 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000248

  21. Amandin (2016), "Project delays on cost overrun risks: A study of Gasabo district construction projects Kigali, Rwanda" in Abc J. Adv. Res., v. 5 (2016), p. 21
  22. Amoatey Charles Teye (2017), "Exploring critical road project delay factors in Ghana" in Journal of Facilities Management, v. 15, n. 2, Emerald, p. 110-127

    https://doi.org/10.1108/JFM-09-2016-0036

  23. Akogbe, Romuald-Kokou T. M. / Feng, Xin / Zhou, Jing (2013): Importance and ranking evaluation of delay factors for development construction projects in Benin. Dans: KSCE Journal of Civil Engineering, v. 17, n. 6 (août 2013).

    https://doi.org/10.1007/s12205-013-0446-2

  24. Faridi, Arshi Shakeel / El‐Sayegh, Sameh Monir (2006): Significant factors causing delay in the UAE construction industry. Dans: Construction Management and Economics, v. 24, n. 11 (novembre 2006).

    https://doi.org/10.1080/01446190600827033

  25. Al-Khalil Mohammed I (1999), "Delay in public utility projects in Saudi Arabia" in International Journal of Project Management, v. 17, n. 2, Elsevier BV, p. 101-106

    https://doi.org/10.1016/S0263-7863(98)00020-9

  26. Khoshgoftar Mohammad (2010), "Causes of Delays in Iranian Construction Projects" in International Journal of Construction Management, v. 10, n. 2, Informa UK Limited, p. 53-69

    https://doi.org/10.1080/15623599.2010.10773144

  27. Saeb Sajjad (2016), "Causes of Delay in Khuzestan Steel Company Construction Projects" in Industrial Engineering and Management Systems, v. 15, n. 4, Korean Institute of Industrial Engineers, p. 335-344

    https://doi.org/10.7232/iems.2016.15.4.335

  28. Koushki, P. A. / Al‐Rashid, K. / Kartam, N. (2005): Delays and cost increases in the construction of private residential projects in Kuwait. Dans: Construction Management and Economics, v. 23, n. 3 (mars 2005).

    https://doi.org/10.1080/0144619042000326710

  29. Odeyinka (1997), "The causes and effects of construction delays on completion cost of housing projects in Nigeria" in J. Financ. Manag. Prop. Constr., v. 2 (1997), p. 31
  30. Iyer, K. C. / Jha, K. N. (2006): Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects. Dans: Journal of Construction Engineering and Management, v. 132, n. 8 (août 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(871)

  31. Sweis Ghaleb J. (2013), "Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan" in International Journal of Business and Management, v. 8, n. 23, Canadian Center of Science and Education

    https://doi.org/10.5539/ijbm.v8n23p120

  32. Chan, Daniel W. M. / Kumaraswamy, Mohan M. (1995): A study of the factors affecting construction durations in Hong Kong. Dans: Construction Management and Economics, v. 13, n. 4 (juillet 1995).

    https://doi.org/10.1080/01446199500000037

  33. Semple, Cheryl / Hartman, Francis T. / Jergeas, George (1994): Construction Claims and Disputes: Causes and Cost/Time Overruns. Dans: Journal of Construction Engineering and Management, v. 120, n. 4 (décembre 1994).

    https://doi.org/10.1061/(asce)0733-9364(1994)120:4(785)

  34. Flyvbjerg Bent (2002), "Underestimating Costs in Public Works Projects:Error or Lie?" in Journal of the American Planning Association, v. 68, n. 3, Informa UK Limited, p. 279-295

    https://doi.org/10.1080/01944360208976273

  35. Flyvbjerg Bent (2003), "How common and how large are cost overruns in transport infrastructure projects?" in Transport Reviews, v. 23, n. 1, Informa UK Limited, p. 71-88

    https://doi.org/10.1080/01441640309904

  36. Ansar Atif (2016), "Does infrastructure investment lead to economic growth or economic fragility? Evidence from China" in Oxford Review of Economic Policy, v. 32, n. 3, Oxford University Press (OUP), p. 360-390

    https://doi.org/10.1093/oxrep/grw022

  37. Sepasgozar Samad M. E. (2019), "Methods for monitoring construction off-road vehicle emissions: a critical review for identifying deficiencies and directions" in Environmental Science and Pollution Research, v. 26, n. 16, Springer Science and Business Media LLC, p. 15779-15794

    https://doi.org/10.1007/s11356-019-05003-6

  38. Zhong, Botao / Wu, Haitao / Li, Heng / Sepasgozar, Samad / Luo, Hanbin (2019): A scientometric analysis and critical review of construction related ontology research. Dans: Automation in Construction, v. 101 (mai 2019).

    https://doi.org/10.1016/j.autcon.2018.12.013

  39. Kim, Hyunsoo / Lee, Hyun-Soo / Park, Moonseo / Ahn, Changbum R. / Hwang, Sungjoo (2015): Productivity Forecasting of Newly Added Workers Based on Time-Series Analysis and Site Learning. Dans: Journal of Construction Engineering and Management, v. 141, n. 9 (septembre 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001002

  40. Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Kim, Hyunsoo (2016): Weather-Delay Simulation Model Based on Vertical Weather Profile for High-Rise Building Construction. Dans: Journal of Construction Engineering and Management, v. 142, n. 6 (juin 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001109

  41. Kwon, Nahyun / Park, Moonseo / Lee, Hyun-Soo / Ahn, Joseph / Kim, Sooyoung (2017): Construction Noise Prediction Model Based on Case-Based Reasoning in the Preconstruction Phase. Dans: Journal of Construction Engineering and Management, v. 143, n. 6 (juin 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001291

  42. Lee, Kwang-Pyo / Lee, Hyun-Soo / Park, Moonseo / Kim, Du Yon / Jung, Minhyuk (2017): Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000510

  43. Yap Jeffrey Boon Hui (2017), "Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs" in Journal of Engineering, Design and Technology, v. 15, n. 6, Emerald, p. 803-825

    https://doi.org/10.1108/JEDT-07-2017-0067

  44. Yap Jeffrey Boon Hui (2017), "Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication" in International Journal of Project Management, v. 35, n. 7, Elsevier BV, p. 1253-1271

    https://doi.org/10.1016/j.ijproman.2017.04.010

  45. Yap, Jeffrey Boon Hui / Skitmore, Martin (2018): Investigating design changes in Malaysian building projects. Dans: Architectural Engineering and Design Management, v. 14, n. 3 (mars 2018).

    https://doi.org/10.1080/17452007.2017.1384714

  46. Yap, Jeffrey Boon Hui / Abdul-Rahman, Hamzah / Wang, Chen (2018): Preventive Mitigation of Overruns with Project Communication Management and Continuous Learning: PLS-SEM Approach. Dans: Journal of Construction Engineering and Management, v. 144, n. 5 (mai 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001456

  47. Yap Jeffrey Boon Hui (2017), "Rework in Malaysian building construction: impacts, causes and potential solutions" in Journal of Engineering, Design and Technology, v. 15, n. 5, Emerald, p. 591-618

    https://doi.org/10.1108/JEDT-01-2017-0002

  48. Abdul-Rahman, H. / Berawi, M. A. / Berawi, A. R. / Mohamed, O. / Othman, M. (2006): Delay Mitigation in the Malaysian Construction Industry. Dans: Journal of Construction Engineering and Management, v. 132, n. 2 (février 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:2(125)

  49. Alashwal, Ali Mohammed / Abdul-Rahman, Hamzah / Radzi, Juwita (2016): Knowledge Utilization Process in Highway Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 4 (juillet 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000429

  50. Enshassi Adnan (2012), "Analysis of Contractors Performance in Gaza Strip Construction Projects" in International Journal of Construction Management, v. 12, n. 2, Informa UK Limited, p. 65-79

    https://doi.org/10.1080/15623599.2012.10773191

  51. Enshassi, Adnan / Arain, Faisal / Al-Raee, Sadi (2010): Causes of Variation Orders in Construction Projects in the Gaza Strip. Dans: Journal of Civil Engineering and Management, v. 16, n. 4 (décembre 2010).

    https://doi.org/10.3846/jcem.2010.60

  52. Enshassi Adnan (2009), "Contractors’ Perception towards Causes of Claims in Construction Projects" in International Journal of Construction Management, v. 9, n. 1, Informa UK Limited, p. 79-92

    https://doi.org/10.1080/15623599.2009.10773123

  53. Enshassi, Adnan / Mohamed, Sherif / Mayer, Peter Eduard (2007): Factors Affecting Labour Productivity in Building Projects in the Gaza Strip. Dans: Journal of Civil Engineering and Management, v. 13, n. 4 (décembre 2007).

    https://doi.org/10.3846/13923730.2007.9636444

  54. Enshassi, Adnan / Mohamed, Sherif / Abushaban, Saleh (2009): Factors Affecting the Performance of Construction Projects in the Gaza Strip. Dans: Journal of Civil Engineering and Management, v. 15, n. 3 (juin 2009).

    https://doi.org/10.3846/1392-3730.2009.15.269-280

  55. Enshassi Adnan (2012), "Major causes of problems between contractors and subcontractors in the Gaza Strip" in Journal of Financial Management of Property and Construction, v. 17, n. 1, Emerald, p. 92-112

    https://doi.org/10.1108/13664381211211064

  56. Enshassi Adnan (2009), "Problems associated with the process of claim management in Palestine" in Engineering, Construction and Architectural Management, v. 16, n. 1, Emerald, p. 61-72

    https://doi.org/10.1108/09699980910927895

  57. Enshassi Adnan (2010), "Significant Factors Causing Time and Cost Overruns in Construction Projects in the Gaza Strip: Contractors’ Perspective" in International Journal of Construction Management, v. 10, n. 1, Informa UK Limited, p. 35-60

    https://doi.org/10.1080/15623599.2010.10773137

  58. Enshassi, Adnan / Kochendoerfer, Bernd / Abed, Karem (2013): Tendencias para optimizar la productividad en los proyectos de construcción en Palestina. Dans: Revista Ingeniería de Construcción, v. 28, n. 2 (août 2013).

    https://doi.org/10.4067/s0718-50732013000200005

  59. Budayan, Cenk (2019): Evaluation of Delay Causes for BOT Projects Based on Perceptions of Different Stakeholders in Turkey. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 1 (janvier 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000668

  60. Alfakhri Aboubaker. Y.Y. (2018), "The Effects of Delays in Road Construction Projects in Tripoli, Libya" in International Journal of Technology, v. 9, n. 4, International Journal of Technology, p. 766

    https://doi.org/10.14716/ijtech.v9i4.2219

  61. Shahsavand Parvaneh (2018), "Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol" in Engineering, Construction and Architectural Management, v. 25, n. 4, Emerald, p. 497-533

    https://doi.org/10.1108/ECAM-10-2016-0220

  62. Khair Khalid (2018), "A Management Framework to Reduce Delays in Road Construction Projects in Sudan" in Arabian Journal for Science and Engineering, v. 43, n. 4, Springer Nature, p. 1925-1940

    https://doi.org/10.1007/s13369-017-2806-6

  63. Arditi David (2017), "Effect of organizational culture on delay in construction" in International Journal of Project Management, v. 35, n. 2, Elsevier BV, p. 136-147

    https://doi.org/10.1016/j.ijproman.2016.10.018

  64. Perera, Nihal Ananda / Sutrisna, Monty / Yiu, Tak Wing (2016): Decision-Making Model for Selecting the Optimum Method of Delay Analysis in Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000441

  65. Ji Yingbo (2018), "Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China" in Applied Sciences, v. 8, n. 11, MDPI AG, p. 2324

    https://doi.org/10.3390/app8112324

  66. Gunduz, Murat / Nielsen, Yasemin / Ozdemir, Mustafa (2015): Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 4 (juillet 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000261

  67. Edwards David John (2017), "Financial distress and highway infrastructure delays" in Journal of Engineering, Design and Technology, v. 15, n. 1, Emerald, p. 118-132

    https://doi.org/10.1108/JEDT-02-2016-0006

  68. Doloi Hemanta (2012), "Structural equation model for investigating factors affecting delay in Indian construction projects" in Construction Management and Economics, v. 30, n. 10, Informa UK Limited, p. 869-884

    https://doi.org/10.1080/01446193.2012.717705

  69. Hasan (2018), "Time overrun model for construction projects in Iraq by using fuzzy logic" in Int. J. Civ. Eng. Technol., v. 9 (2018), p. 2593
  70. Kamanga (2013), "Causes of delay in road construction projects in Malawi" in J. S. Afr. Inst. Civ. Eng., v. 55 (2013), p. 79
  71. Vu Hong Anh (2017), "Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model" in Engineering, Construction and Architectural Management, v. 24, n. 6, Emerald, p. 1018-1039

    https://doi.org/10.1108/ECAM-06-2016-0138

  72. Ballesteros-Pérez Pablo (2015), "Climate and construction delays: case study in Chile" in Engineering, Construction and Architectural Management, v. 22, n. 6, Emerald, p. 596-621

    https://doi.org/10.1108/ECAM-02-2015-0024

  73. Mpofu Bekithemba (2017), "Profiling causative factors leading to construction project delays in the United Arab Emirates" in Engineering, Construction and Architectural Management, v. 24, n. 2, Emerald, p. 346-376

    https://doi.org/10.1108/ECAM-05-2015-0072

  74. Sambasivan Murali (2017), "Analysis of delays in Tanzanian construction industry" in Engineering, Construction and Architectural Management, v. 24, n. 2, Emerald, p. 308-325

    https://doi.org/10.1108/ECAM-09-2015-0145

  75. Wang Ting-Kwei (2018), "Causes of delays in the construction phase of Chinese building projects" in Engineering, Construction and Architectural Management, v. 25, n. 11, Emerald, p. 1534-1551

    https://doi.org/10.1108/ECAM-10-2016-0227

  76. Islam, Muhammad Saiful / Suhariadi, Bambang Trigunarsyah (2018): Construction delays in privately funded large building projects in Bangladesh. Dans: Asian Journal of Civil Engineering, v. 19, n. 4 (mars 2018).

    https://doi.org/10.1007/s42107-018-0034-3

  77. Khatib Basem (2018), "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project" in Sustainability, v. 10, n. 12, MDPI AG, p. 4772

    https://doi.org/10.3390/su10124772

  78. Larsen, Jesper Kranker / Shen, Geoffrey Qiping / Lindhard, Søren Munch / Brunoe, Thomas Ditlev (2016): Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000391

  79. Zidane Youcef J.-T. (2018), "The top 10 universal delay factors in construction projects" in International Journal of Managing Projects in Business, v. 11, n. 3, Emerald, p. 650-672

    https://doi.org/10.1108/IJMPB-05-2017-0052

  80. Alfakhri (2017), "A conceptual model of delay factors affecting road construction projects in Libya" in J. Eng. Sci. Technol., v. 12 (2017), p. 3286
  81. Das, Dilip Kumar / Emuze, Fidelis (2017): A Dynamic Model of Contractor-Induced Delays in India. Dans: Journal of Construction in Developing Countries, v. 22, n. 1 ( 2017).

    https://doi.org/10.21315/jcdc2017.22.1.2

  82. Parchami Jalal Majid (2017), "A hybrid SD-DEMATEL approach to develop a delay model for construction projects" in Engineering, Construction and Architectural Management, v. 24, n. 4, Emerald, p. 629-651

    https://doi.org/10.1108/ECAM-02-2016-0056

  83. Renuka (2017), "A model to estimate the time overrun risk in construction projects" in Empir. Res. Urban Manag., v. 12 (2017), p. 64
  84. Adam Abderisak (2017), "Aggregation of factors causing cost overruns and time delays in large public construction projects" in Engineering, Construction and Architectural Management, v. 24, n. 3, Emerald, p. 393-406

    https://doi.org/10.1108/ECAM-09-2015-0135

  85. Asiedu, Richard Ohene / Adaku, Ebenezer / Owusu-Manu, De-Graft (2017): Beyond the causes – rethinking mitigating measures to avert cost and time overruns in construction projects. Dans: Construction Innovation, v. 17, n. 3 (mai 2017).

    https://doi.org/10.1108/ci-01-2016-0003

  86. Durdyev Serdar (2017), "Causes of delay in residential construction projects in Cambodia" in Cogent Engineering, v. 4, n. 1, Informa UK Limited

    https://doi.org/10.1080/23311916.2017.1291117

  87. Oyegoke Adekunle Sabitu (2017), "The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman" in Journal of Financial Management of Property and Construction, v. 22, n. 3, Emerald, p. 286-302

    https://doi.org/10.1108/JFMPC-11-2016-0052

  88. Agyekum-Mensah George (2017), "The professionals’ perspective on the causes of project delay in the construction industry" in Engineering, Construction and Architectural Management, v. 24, n. 5, Emerald, p. 828-841

    https://doi.org/10.1108/ECAM-03-2016-0085

  89. Amoatey Charles Teye (2015), "Analysing delay causes and effects in Ghanaian state housing construction projects" in International Journal of Managing Projects in Business, v. 8, n. 1, Emerald, p. 198-214

    https://doi.org/10.1108/IJMPB-04-2014-0035

  90. Bekr (2015), "Causes of delay in public construction projects in Iraq" in Jordan J. Civ. Eng., v. 159 (2015), p. 1
  91. Mahamid Ibrahim (2015), "Risk Matrix for Delay Causes in Construction Projects in Saudi Arabia" in Research Journal of Applied Sciences, Engineering and Technology, v. 9, n. 8, Maxwell Scientific Publication Corp., p. 665-670

    https://doi.org/10.19026/rjaset.9.1452

  92. Santoso, Djoen San / Soeng, Sothy (2016): Analyzing Delays of Road Construction Projects in Cambodia: Causes and Effects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 6 (novembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000467

  93. Kadry (2016), "Causes of construction delays in countries with high geopolitical risks. J. Constr" in Eng. Manag., v. 143 (2016), p. 1
  94. Kim, Soo-Yong / Tuan, Kiet Nguyen / Luu, Van Truong (2015): Delay factor analysis for hospital projects in Vietnam. Dans: KSCE Journal of Civil Engineering, v. 20, n. 2 (avril 2015).

    https://doi.org/10.1007/s12205-015-0316-1

  95. Bagaya, Ousseni / Song, Jinbo (2016): Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 5 (septembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000443

  96. Aziz Remon F. (2016), "Exploring delay causes of road construction projects in Egypt" in Alexandria Engineering Journal, v. 55, n. 2, Elsevier BV, p. 1515-1539

    https://doi.org/10.1016/j.aej.2016.03.006

  97. Assbeihat (2016), "Factors Affecting Delays on Private Construction Projects" in Technology, v. 7 (2016), p. 22
  98. Nawi (2016), "Factors influencing project delay: A case study of the vale malaysia minerals project (VMMP)" in Int. J. Supply Chain Manag., v. 5 (2016), p. 178
  99. Samarghandi, Hamed / Tabatabaei, Seyed Mohammad Moosavi / Taabayan, Pouria / Hashemi, Ahmad Mir / Willoughby, Keith (2016): Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran. Dans: Journal of Construction in Developing Countries, v. 21, n. 1 ( 2016).

    https://doi.org/10.21315/jcdc2016.21.1.4

  100. Zailani Suhaiza (2016), "The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance" in Journal of Science and Technology Policy Management, v. 7, n. 3, Emerald, p. 346-368

    https://doi.org/10.1108/JSTPM-12-2015-0041

  101. Al‐Kharashi, Adel / Skitmore, Martin (2009): Causes of delays in Saudi Arabian public sector construction projects. Dans: Construction Management and Economics, v. 27, n. 1 (janvier 2009).

    https://doi.org/10.1080/01446190802541457

  102. Kaliba Chabota (2009), "Cost escalation and schedule delays in road construction projects in Zambia" in International Journal of Project Management, v. 27, n. 5, Elsevier BV, p. 522-531

    https://doi.org/10.1016/j.ijproman.2008.07.003

  103. Enshassi Adnan (2009), "Delays and cost overruns in the construction projects in the Gaza Strip" in Journal of Financial Management of Property and Construction, v. 14, n. 2, Emerald, p. 126-151

    https://doi.org/10.1108/13664380910977592

  104. Abdul-Rahman Hamzah (2009), "Financial-related causes contributing to project delays" in Journal of Retail & Leisure Property, v. 8, n. 3, Springer Science and Business Media LLC, p. 225-238

    https://doi.org/10.1057/rlp.2009.11

  105. Mahamid, Ibrahim / Bruland, Amund / Dmaidi, Nabil (2012): Causes of Delay in Road Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 3 (juillet 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000096

  106. Kazaz, Aynur / Ulubeyli, Serdar / Tuncbilekli, Nihan Avcioglu (2012): Causes of Delays in Construction Projects in Turkey. Dans: Journal of Civil Engineering and Management, v. 18, n. 3 (juin 2012).

    https://doi.org/10.3846/13923730.2012.698913

  107. Chandramohan Arun (2012), "Cost and time overrun analysis for green construction projects" in International Journal of Green Economics, v. 6, n. 2, Inderscience Publishers, p. 167

    https://doi.org/10.1504/IJGE.2012.050340

  108. Yang Jyh-Bin (2013), "An Empirical Study of Schedule Delay Causes Based on Taiwan's Litigation Cases" in Project Management Journal, v. 44, n. 3, SAGE Publications, p. 21-31

    https://doi.org/10.1002/pmj.21337

  109. González, Pablo / González, Vicente / Molenaar, Keith / Orozco, Francisco (2014): Analysis of Causes of Delay and Time Performance in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 140, n. 1 (janvier 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000721

  110. Golob, Ksenija / Bastič, Majda / Pšunder, Igor (2013): Influence of Project and Marketing Management on Delays, Penalties, and Project Quality in Slovene Organizations in the Construction Industry. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 4 (octobre 2013).

    https://doi.org/10.1061/(asce)me.1943-5479.0000146

  111. Alinaitwe (2013), "Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects" in J. Constr. Dev. Ctries., v. 18 (2013), p. 33
  112. Marzouk Mohamed M. (2014), "Analyzing delay causes in Egyptian construction projects" in Journal of Advanced Research, v. 5, n. 1, Elsevier BV, p. 49-55

    https://doi.org/10.1016/j.jare.2012.11.005

  113. Wang, Wei-Chih / Lin, Chia-Li / Wang, Shih-Hsu / Liu, Jang-Jeng / Lee, Ming-Tsung (2014): Application of Importance-satisfaction Analysis and Influence-relations Map To Evaluate Design Delay Factors. Dans: Journal of Civil Engineering and Management, v. 20, n. 4 (juillet 2014).

    https://doi.org/10.3846/13923730.2013.801922

  114. Yang, Jyh-Bin / Huang, Kuei-Mei / Lee, Chang-Hung / Chiu, Chui-Te (2014): Incorporating lost productivity calculation into delay analysis for construction projects. Dans: KSCE Journal of Civil Engineering, v. 18, n. 2 (janvier 2014).

    https://doi.org/10.1007/s12205-014-0128-8

  115. Yang Jyh-Bin (2012), "Critical path effect based delay analysis method for construction projects" in International Journal of Project Management, v. 30, n. 3, Elsevier BV, p. 385-397

    https://doi.org/10.1016/j.ijproman.2011.06.003

  116. Chaphalkar, Nitin Balkrishna / Iyer, K. C. (2014): Factors influencing decisions on delay claims in construction contracts for Indian scenario. Dans: Australasian Journal of Construction Economics and Building, v. 14, n. 1 (mars 2014).

    https://doi.org/10.5130/ajceb.v14i1.3766

  117. Braimah, Nuhu (2014): Understanding Construction Delay Analysis and the Role of Preconstruction Programming. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 5 (septembre 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000216

  118. Abdelhadi Yazeed (2019), "Factors influencing the selection of delay analysis methods in construction projects in UAE" in International Journal of Construction Management, v. 19, n. 4, Informa UK Limited, p. 329-340

    https://doi.org/10.1080/15623599.2018.1435155

  119. Guévremont Michel (2018), "Visualization of Delay Claim Analysis Using 4D Simulation" in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3, American Society of Civil Engineers (ASCE), p. 05018002

    https://doi.org/10.1061/(ASCE)LA.1943-4170.0000267

  120. Yang Jyh-Bin (2017), "Theoretical development of stochastic delay analysis and forecast method" in Journal of the Chinese Institute of Engineers, v. 40, n. 5, Informa UK Limited, p. 391-400

    https://doi.org/10.1080/02533839.2017.1336115

  121. Yang, Jyh-Bin / Wei, Pei-Rei (2010): Causes of Delay in the Planning and Design Phases for Construction Projects. Dans: Journal of Architectural Engineering (ASCE), v. 16, n. 2 (juin 2010).

    https://doi.org/10.1061/(asce)1076-0431(2010)16:2(80)

  122. Chen Gui-Xiang (2019), "Investigating the causes of delay in grain bin construction projects: the case of China" in International Journal of Construction Management, v. 19, n. 1, Informa UK Limited, p. 1-14

    https://doi.org/10.1080/15623599.2017.1354514

  123. Apipattanavis, Somkiat / Sabol, Kevin / Molenaar, Keith R. / Rajagopalan, Balaji / Xi, Yunping (2010): Integrated Framework for Quantifying and Predicting Weather-Related Highway Construction Delays. Dans: Journal of Construction Engineering and Management, v. 136, n. 11 (novembre 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000199

  124. he Committee for Disposal and Recycling of Constr,

    https://doi.org/10.12691/ajcea-3-1-3

  125. Sepasgozar / Davis (2019): Digital Construction Technology and Job-site Equipment Demonstration: Modelling Relationship Strategies for Technology Adoption. Dans: Buildings, v. 9, n. 7 (juillet 2019).

    https://doi.org/10.3390/buildings9070158

  126. Shirowzhan, Sara / Sepasgozar, Samad M. E. / Li, Heng / Trinder, John / Tang, Pingbo (2019): Comparative analysis of machine learning and point-based algorithms for detecting 3D changes in buildings over time using bi-temporal lidar data. Dans: Automation in Construction, v. 105 (septembre 2019).

    https://doi.org/10.1016/j.autcon.2019.102841

  127. Shirowzhan, Sara / Sepasgozar, Samad M. E. / Li, Heng / Trinder, John (2018): Spatial compactness metrics and Constrained Voxel Automata development for analyzing 3D densification and applying to point clouds: A synthetic review. Dans: Automation in Construction, v. 96 (décembre 2018).

    https://doi.org/10.1016/j.autcon.2018.09.018

  128. Shirowzhan Sara (2017), "Building Classification from Lidar Data for Spatio-temporal Assessment of 3D Urban Developments" in Procedia Engineering, v. 180, Elsevier BV, p. 1453-1461

    https://doi.org/10.1016/j.proeng.2017.04.308

  129. Shirowzhan, Sara / Lim, Samsung / Trinder, John (2016): Enhanced Autocorrelation-Based Algorithms for Filtering Airborne Lidar Data over Urban Areas. Dans: Journal of Surveying Engineering (ASCE), v. 142, n. 2 (mai 2016).

    https://doi.org/10.1061/(asce)su.1943-5428.0000149

  130. Shirowzhan Sara (2014), "Autocorrelation Statistics-Based Algorithms for Automatic Ground and Non-Ground Classification of Lidar Data" in Proceedings of the 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC), International Association for Automation and Robotics in Construction (IAARC)

    https://doi.org/10.22260/ISARC2014/0121

  131. Tahmasebinia, Faham / Niemelä, Marjo / Ebrahimzadeh Sepasgozar, Sanee / Lai, Tin / Su, Winson (2018): Three-Dimensional Printing Using Recycled High-Density Polyethylene: Technological Challenges and Future Directions for Construction. Dans: Buildings, v. 8, n. 11 (novembre 2018).

    https://doi.org/10.3390/buildings8110165

  132. Sepasgozar, Samad M. E. / Davis, Steven R. / Li, Heng / Luo, Xianrui (2018): Modeling the Implementation Process for New Construction Technologies: Thematic Analysis Based on Australian and U.S. Practices. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 3 (mai 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000608

  133. Sepasgozar, Samad / Davis, Steven (2018): Construction Technology Adoption Cube: An Investigation on Process, Factors, Barriers, Drivers and Decision Makers Using NVivo and AHP Analysis. Dans: Buildings, v. 8, n. 6 (mai 2018).

    https://doi.org/10.3390/buildings8060074

  134. Sepasgozar, Samad M. E. / Davis, Steven R. / Loosemore, Martin (2018): Dissemination Practices of Construction Sites’ Technology Vendors in Technology Exhibitions. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 6 (novembre 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000650

  135. Sepasgozar Samad M.E. (2018), "An investigation of modern building equipment technology adoption in the Australian construction industry" in Engineering, Construction and Architectural Management, v. 25, n. 8, Emerald, p. 1075-1091

    https://doi.org/10.1108/ECAM-03-2017-0052

  136. Sepasgozar Samad M.E. (2017), "The role of customers and vendors in modern construction equipment technology diffusion" in Engineering, Construction and Architectural Management, v. 24, n. 6, Emerald, p. 1203-1221

    https://doi.org/10.1108/ECAM-06-2016-0149