Deformation in settlement and grouting remediation of thickened larger-diameter metro shield tunnel in soft soil: A case study
Auteur(s): |
Cirong Lu
Xiaohui Zhang Beibei Shi Jianqun Jiang Zhangrun Lin |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Case Studies in Construction Materials, juillet 2024, v. 20 |
Page(s): | e02736 |
DOI: | 10.1016/j.cscm.2023.e02736 |
- Informations
sur cette fiche - Reference-ID
10755944 - Publié(e) le:
14.01.2024 - Modifié(e) le:
14.01.2024