Defining the Maturity Levels for Implementing Industrial Logistics Practices in Construction
Auteur(s): |
Müge Tetik
Antti Peltokorpi Olli Seppänen Jan Holmström |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Frontiers in Built Environment, janvier 2021, v. 7 |
DOI: | 10.3389/fbuil.2021.740086 |
Abstrait: |
Logistics practices are processes that require alignment and coordination among project actors to support successful construction operations. While recent research has underlined the effects of single material logistics practices on project performance, practitioners need more knowledge on development paths toward successful overall logistics solutions. Based on a review of current practices obtained from the literature, this research proposes the maturity levels of planning, organizing, operating, use of technology, and information flow regarding the logistics practices in construction. Moreover, the study devises a recommended order for implementing logistics practices and investigates how companies can advance their logistics maturity from one level to the next. The proposed model has been validated via case examples from the industry. The paper contributes to construction logistics research by describing how companies can navigate development efforts to gradually improve their logistics practices. Future research could conduct more case studies within different project contexts. |
Copyright: | © 2021 Müge Tetik, Antti Peltokorpi, Olli Seppänen, Jan Holmström |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
1.98 MB
- Informations
sur cette fiche - Reference-ID
10658838 - Publié(e) le:
17.02.2022 - Modifié(e) le:
01.06.2022