Auteur(s): |
Karl Terzaghi
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Géotechnique, septembre 1962, n. 3, v. 12 |
Page(s): | 199-208 |
DOI: | 10.1680/geot.1962.12.3.199 |
Abstrait: |
Synopsis The Paper describes the rock conditions encountered in sheeted granite at and beneath the surface of contact between bedrock and a zoned earth dam with a height of 331 ft. Many of the significant features of the rock geology could not be ascertained prior to construction. Therefore the details of the design and of the construction procedures for establishing a satisfactory bond between dam and bedrock had to be worked out while construction was in progress. The experience gained during this period demonstrates the decisive influence of the relationship between headquarters and construction personnel on the soundness and quality of the completed structure. L'article décrit les conditions rocheuses recontrées dans le granit feuilleté à la surface et sous la surface de contact de l'assise rocheuse et d'un barrage de terre zoné d'une hauteur de 331 pieds. De nombreuses caractéristiques significatives géologiques du granit n'ont pas pu être déterminées avant la construction. Les détails des plans et des procédés de construction pour établir un lien satisfaisant entre le barrage et l'assise rocheuse ont dû être déterminés en tours de construction. L'expérience gagnée pendant cette période montre l'influence décisive de la relation entre les bureaux principaux et le personnel de construction sur la solidité et la qualité de la structure terminée. |
- Informations
sur cette fiche - Reference-ID
10674177 - Publié(e) le:
18.06.2022 - Modifié(e) le:
18.06.2022