Auteur(s): |
John Aldrich
Mark Vilem Michael Oakland |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering Magazine, novembre 2003, n. 11, v. 73 |
Abstrait: |
Expanding Cleveland's airport required that a mile-long section of stream located within a deep, steep ravine be buried. The resulting culvert called for a design that would address significant hydraulic, geotechnical, and erosion control issues. |