A critical study of the existing issues in circular economy practices during movement control order: can BIM fill the gap?
Auteur(s): |
Zul-Atfi Bin Ismail
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, janvier 2023, n. 8, v. 30 |
Page(s): | 3224-3241 |
DOI: | 10.1108/ecam-08-2021-0676 |
- Informations
sur cette fiche - Reference-ID
10693399 - Publié(e) le:
23.09.2022 - Modifié(e) le:
02.09.2023