Cost Overruns and Formal Risk Assessment Program in US Rail Transit Projects
Auteur(s): |
Nan Gao
Ali Touran |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, mai 2020, n. 5, v. 146 |
Page(s): | 05020004 |
DOI: | 10.1061/(asce)co.1943-7862.0001827 |
- Informations
sur cette fiche - Reference-ID
10416926 - Publié(e) le:
17.03.2020 - Modifié(e) le:
17.03.2020