Control panel and indicators for production control in building projects
Auteur(s): |
Pablo Orihuela
Santiago Pacheco Jorge Orihuela |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Organization, Technology and Management in Construction, novembre 2018, n. 1, v. 10 |
Page(s): | 1665-1673 |
DOI: | 10.1515/otmcj-2016-0027 |
Abstrait: |
In general, every project should have indicators that monitor compliance with established goals. In construction projects, there are a large number of indicators proposed by many researchers; however, an analysis of the state of the art shows a frequent confusion between Result, Process and Leading Indicators. This paper, which is an extended version of the paper submitted by the same authors at the Creative Construction Conference 2017 and published in Procedia Engineering ( |