0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Contract Information Asymmetry: Legal Disconnect within the Project Team

Auteur(s): (Bachelor of Construction Management (Building) (Honors), School of Architecture and Built Environment, Faculty of Engineering and Built Environment, Univ. of Newcastle, Callaghan, NSW 2308, Australia.)
(Professor of Construction Management, School of Architecture and Built Environment, Faculty of Engineering and Built Environment, Univ. of Newcastle, Callaghan, NSW 2308, Australia (corresponding author).)
(Partner, Nexus Law Group, Level 1, 6/239 King St., Newcastle, NSW 2300, Australia.)
Médium: article de revue
Langue(s): anglais
Publié dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 9
Page(s): 04517015
DOI: 10.1061/(asce)la.1943-4170.0000231
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1061/(asce)la.1943-4170.0000231.
  • Informations
    sur cette fiche
  • Reference-ID
    10579860
  • Publié(e) le:
    08.03.2021
  • Modifié(e) le:
    08.03.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine