Contingency for Cost Control in Project Management: A Case Study

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Australasian Journal of Construction Economics and Building, , n. 1, v. 3
Page(s): 1-12
DOI: 10.5130/ajceb.v3i1.2906
Abstrait:

This paper provides a case study of the application of cost management techniques for project management of capital works within a major Australian electricity corporation. Historical data was collected from the corporation's archived files to establish the performance status of completed capital works projects. A survey of the corporation's project staff was also conducted to determine the current usage of cost management techniques and further explore the findings of the historical data search.The research indicates a reluctance to utilise formal cost management procedures on minor projects, estimated to cost less than $1 million. The time constraints allocated to project management planning and the perceived cost to implement procedures were identified as contributing to the limited use of formal cost management on minor projects.The paper concludes that increased risk of poor budget performance is inevitable if formal cost control is not applied to capital works projects, and recommends informal risk assessment and cost contingency measures to address this issue.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.5130/ajceb.v3i1.2906.
  • Informations
    sur cette fiche
  • Reference-ID
    10338749
  • Publié(e) le:
    05.08.2019
  • Modifié(e) le:
    05.08.2019
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine