A contingency approach for time-cost trade-off in construction projects based on machine learning techniques
Auteur(s): |
Peipei Wang
Kun Wang Yunhan Huang Peter Fenn |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-11-2022-1104 |
- Informations
sur cette fiche - Reference-ID
10729790 - Publié(e) le:
30.05.2023 - Modifié(e) le:
30.05.2023