Construction risk probability assessment of shield tunneling projects in karst areas based on improved two-dimensional cloud model
Auteur(s): |
Huaiyuan Sun
Yi Rui Yanyun Lu Yiming Dai Xiang Wang Xiaojun Li |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Tunnelling and Underground Space Technology, décembre 2024, v. 154 |
Page(s): | 106086 |
DOI: | 10.1016/j.tust.2024.106086 |
- Informations
sur cette fiche - Reference-ID
10799168 - Publié(e) le:
23.09.2024 - Modifié(e) le:
23.09.2024