Construction Problems of the Manhattan-Bronx, and Lexington Avenue Subway Junction Borough Tunnel Connections
Auteur(s): |
George Perrine
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Transactions of the American Society of Civil Engineers, 1918, n. 1, v. 82 |
Page(s): | 278-319 |
DOI: | 10.1061/taceat.0002897 |
- Informations
sur cette fiche - Reference-ID
10594412 - Publié(e) le:
14.04.2021 - Modifié(e) le:
14.04.2021