Construction of Umi-No-Mori Bridge Using Barges and Multi-Axle Transporters
Auteur(s): |
Shinichi Tsubota
(IHI Infrastructure Systems Co., Business Strategy Division, Bridge Management Department, Osaka, Japan)
Goshi Tagashira (IHI Infrastructure Systems Co., Engineering Department, Bridge Engineering Division, Sakai, Osaka, Japan) Ryuji Takeshima (IHI Infrastructure Systems Co., Strategy Department 3, Business Strategy Division, Tokyo, Japan) Akihiro Kambara (Tokyo Port Construction Office, Tokyo Metropolitan Government, Tokyo, Japan) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structural Engineering International |
Page(s): | 1-4 |
DOI: | 10.1080/10168664.2024.2404505 |
- Informations
sur cette fiche - Reference-ID
10801101 - Publié(e) le:
10.11.2024 - Modifié(e) le:
10.11.2024