0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Construction of Slančíková Street - Wilson Riverside Bridge in Nitra

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Procedia Engineering, , v. 40
Conférence: Steel Structures and Bridges 2012
Page(s): 393-398
DOI: 10.1016/j.proeng.2012.07.114
Abstrait: The new structure of a road cable-stayed bridge is introduced in the article. Some specialties, like a solution of sidewalks for cyclists and pedestrians by combination of steel and timber members, are presented. Anchorage of balancing hangers into an abutment by manner of prestressed rods represents another non-traditional solution. Pressured concreting of pylons and part of main girders was applied, too. The bridge was built to substitute an old cable-stayed footbridge, which was removed as soon as the new bridge structure had been completed. The new bridge was officially opened on June 11, 2011. Total weight of the steel structure represents 250 tons.
Mots-clé:
ponts ferroviaires
Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1016/j.proeng.2012.07.114.
  • Informations
    sur cette fiche
  • Reference-ID
    10077420
  • Publié(e) le:
    04.12.2017
  • Modifié(e) le:
    13.02.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine