Construction of a cutoff wall by the diaphragm wall method in the foundation pit of a bank pumping station
Auteur(s): |
A. N. Domarev
V. A. Nepomnyashchii M. S. Sorokovkin B. S. Fedorov |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Soil Mechanics and Foundation Engineering, septembre 1979, n. 5, v. 16 |
Page(s): | 255-259 |
DOI: | 10.1007/bf01705356 |
- Informations
sur cette fiche - Reference-ID
10202756 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018