Constraint Programming Approach to Optimizing Project Schedules under Material Logistics and Crew Availability Constraints
Auteur(s): |
Jing Liu
Ming Lu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, juillet 2018, n. 7, v. 144 |
Page(s): | 04018049 |
DOI: | 10.1061/(asce)co.1943-7862.0001507 |