Conceptualizing "COBieEvaluator"
A rule based system for tracking asset changes using COBie datasheets
Auteur(s): |
Vishal Kumar
Evelyn Teo Ai Lin |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, 2020, n. 5, v. 27 |
Page(s): | 1093-1118 |
DOI: | 10.1108/ecam-04-2019-0216 |
Abstrait: |
PurposeUntil now, the usage and usability factors of construction operation building information exchange (COBie) datasheet has remained largely overlooked. This oversight may be the potential factor in the lower adoption rates as well as effective utilization of COBie datasheet in the architectural, engineering and construction – facilities management industry. Cobie Data drops as a concept has difficulty in adoption pertaining to lengthy process of data capturing with high reliance on manual inputs. Finding from this study will enhance the usability aspects of COBie by looking at the entire process of data assembling in conjuncture with design development and using it to understand the project changes. The paper aims to discuss these issues. Design/methodology/approachThe study is aimed at solving a practical issue in handling COBie datasheets. The study uses iterative steps from design thinking and software development process (SDP) for development of the system. The iterative approach from design thinking helped to understand the problem scenarios, development of rule sets and analysis of various options to tackle this issue. SDP was used for the development and validation of the COBieEvaluator prototype. FindingsDespite the information exchange standards such as COBie is available for adoption for quite some time, its perceived value in the whole chain is less described. Various concepts such as preparing COBie sheets from beginning of project are discussed but hardly adopted due to lengthy process. The study helps in substantiating the need for a continuous data capture and showcase how this continuous data capture can help in tracking various design and equipment changes inside a project, using COBieEvaluator. A comparative view over the data helps in giving fruitful information about the project. The system also verify the quality of data inside the COBie datasheet by not only looking at the cell value inputs but also looking at the entire information linkage and finding the gaps. Originality/valueCOBie has mostly being analyzed as an output and its benefits. However, some important aspects of COBie datasheet such as the process of capturing and verifying it, and understanding the meaning of the changes during incremental building of COBie datasheet, is largely overlooked. This study use the concept behind COBie data drops and devise a system to help track effect of project design changes on COBie datasheet. It also highlights the importance of not looking COBie datasheets only as a FM handover requirement, but a source of information which can help various stakeholders to get useful information about the project development. The study propose a comparative dimension over the COBie sheet to get useful insight over the project development. |
- Informations
sur cette fiche - Reference-ID
10576905 - Publié(e) le:
26.02.2021 - Modifié(e) le:
29.05.2022